Hi to all.
Been a while since I contributed but have been lurking in the background.
A lot has changed for me since my last visit. I am now back in the Lancaster / Morecambe area, but married! And living in a new house. A house without a workshop, oh dear.
So I decided to remedy that situation (after much begging).
I decided to build a workshop made from stone this time, rather than wood, to keep costs down.
![](https://dl.dropboxusercontent.com/u/84234930/1475638653498.jpg)
My father in law and I supervised the younger ones Barrow in the concrete, which we then sorted
![](https://dl.dropboxusercontent.com/u/84234930/1475638689765.jpg)
The building materials were delivered out front, and I had to move them to the back on my own, sometimes bribery fails
![Huh ???](https://www.awgb.co.uk/awgbforum/Smileys/classic/huh.gif)
![](https://dl.dropboxusercontent.com/u/84234930/20160922_110331.jpg)
That was 10 days ago, since then I have been let down 6 times by builders, with a grand total of only 2 hours building actually being done, but have been assured (again), that the shell will be up by the weekend.
![](https://dl.dropboxusercontent.com/u/84234930/20161001_172909.jpg)
Not sure what roof is going on there yet, as for the doors, I guess I'll make those
![Grin ;D](https://www.awgb.co.uk/awgbforum/Smileys/classic/grin.gif)